EasyManua.ls Logo

INVT BD Series

INVT BD Series
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setting Setting
WORK MODE
Select the peak clipping and valley filling mode, you also need to set
the charge and discharge time.
Time setup
Interface
Description
CHAG S T AR T :
00
:00
This interface is used to opt for the time
of peak load shifting.
Press Up/Down button to move
the corresponding options.
Press Enter to enter the selected menu.
Press Esc button to return to the working
mode interface.
C H A R G E END:
00
:00
DISC S T A R T :
00
:00
DISCHA END:
00
:00
PV INPUT
Interface
Description
--INPUT MODE--
1: IN DE PEN DAN T
2: P A R A L L E L
3: CV
Setup of PV Input mode.
The factory setting by default is
Independant, When parallel input is set
to be stand-alone
mode, PV power will be imbalanced.
Interface
Description
--WORK MODE--
1 : SELF COMSUME
2: P EAK SH I FT
3:BAT P RI ORITY
This interface is used to select
the working
mode.
Press ESC button return to setting
interface.
( refer to 8.2.1)
EPS ENABLE
Interface Description
-- EPS ENABLE --
1:DI SABLE
2:ENABLE
When the Grid PV is powered o, Enable the
battery to supply power to the load, default
option is enable.
REMOTE CTRL
Interface Description
--REMOTE CTRL--
1:DISABLE
2:ENABLE
When you want to remotely control the
machine, you need to enable it.
Default option is disabled.
Battery wake up enable
Interface Description
-- BAT WAKE-UP --
1:DI SABLE
2:ENABLE
Battery wake-up enable
setting. The default option
is disabled.
START DELAY
Interface Description
--START-UP DELAY--
INPUT:60
UINT:SEC
The input value ranges from 20 to
300,which varies with dierent
standards.
50 51

Related product manuals