EasyManuals Logo
Home>INVT>Inverter>BD Series

INVT BD Series User Manual

INVT BD Series
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
2.3 CE Directives
This chapter follows the requirements of the European low voltage directives,
which contains the safety instructions and conditions of acceptability for
the endues system, which you must follow when installing, operating and
servicing the unit. If ignored, physical injury or death may follow, or
damage may occur to the unit. Read this before you work on the unit. If you
are unable to understand the dangers, warnings, cautions or instructions,
please contact an authorized service dealer before installing. Operating
and servicing the unit.
The Grid connected inverter meets the requirement stipulated in Low Voltage
Directive (LVD) 2014/35/EU and Electromagnetic Compatibility (EMC) Directive
2014/30/EU. The unit is based on: EN 62109-1:2010;EN 62109-2:2011;IEC
62109-1(ed.1); IEC62109-2(ed.1);EN 61000-6-3:2007+A:2011;EN 61000-6-
1:2007;EN 61000-6-2:2005.
In case of installation in PV system, startup of the unit (i.e. start of
designated operation) is prohibited until it is determined that the full
system meets the requirements stipulated in EC Directive
(2014/35/EU,2014/30/EU, etc.),The grid connected inverter leave the
factory completely connecting device and ready for connection to the
mains and PV supply ,the unit shall be installed in accordance with
national wiring regulations. Compliance with safety regulations depends
upon installing and configuring system correctly, including using the
specified wires.
The system must be installed only by professional assemblers who are
familiar with requirements for safety and EMC. The assembler is responsible
for ensuring that the end system complies with all the relevant laws in the
country where it is to be used.
The individual subassembly of the system shall be interconnected by
means of the wiring methods outlined in national/inter national such as
the national electric code (NFPA) No.70 or VDE regulation 0107.
The inverter can not be disposed together with the household
waste. Disposal information can be found in the enclosed
documentation.
Do not operate this inverter until it is isolated from
battery, mains and on-site PV generation suppliers.
Danger to life due to high voltage.
There is residual voltage existing in the inverter after
powering o,
which needs 5 min to discharge.
Wait 5 min before you open the upper lid or the DC lid.
Symbol Explanation
CE mark.
The inverter complies with the requirements of the
applicable CE guildlines.
TUV certified.
RCM remark.
SAA certification.
Beware of hot surface.
The inverter can become hot during operation. Avoid
contact during operation.
Danger of high voltages.
Danger to life due to high voltages in the inverter!
Danger.
Risk of electric shock!
Observe enclosed documentation.
2.2 Explanation of Symbol
This section gives an explanation of all the symbols shown on the
inverter and on the type label.
Symbols on the Type Label
Safety Safety
08
09

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the INVT BD Series and is the answer not in the manual?

INVT BD Series Specifications

General IconGeneral
BrandINVT
ModelBD Series
CategoryInverter
LanguageEnglish

Related product manuals