EasyManua.ls Logo

Jade 32J - Commissioning of the Tanning Equipment

Jade 32J
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
MARK76J0002 Rev 3
The equipment is initially commissioned by a certied ProSun technician. The device will
be properly assembled and handed over ready for us. In order to properly commission the
tanning equipment, the business owner must ensure that the location is ready prior to the
equipment being installed. This included having correct power requirements and having the
room in which the unit will be located ready.
The unit incorporates special preventive measures with regard to the electromagnetic
compatibility and must be installed and commissioned according to the EMC instructions
obtained from the assembly instructions.
If the equipment has not been used for a longer period of time, then it must rst
be inspected by a certied technician before being put back into operation again.
Commissioning of the tanning equipment

Table of Contents

Related product manuals