25
Protection of Heat
Aheatshieldisavailableasanoptionalextra.Tottheheatshield
seesectionon“ttingtherearheatshield”.Thedistanceto
combustiblematerialwillbereducedwhentheheatshieldistted.
Additional Protection of Heat
Asonallheatproducingappliancestheuseofammablewallcoveringsdirectlyaboveortothesidesofthe
remayleadtoarehazard.Pleasebearthisinmindwheninstallingtheapplianceordecorating.Dueto
theextremetemperaturesthatcanbeachievedabovetherealwaysensurethatanyTV’s,paintingsorother
combustible items that may be near do not become excessively hot. For TV’s always consult the manufacturers
instructions to see if exposure to heat will cause damage.
Ifindoubtalwaysconsultthebuildingregulationsregardingtheproximityofcombustiblematerials.
Operating Instructions
Lighting after Installation
A Jetmaster should not be run hard until any surrounding cement and plasterwork is completely dry and cured.
As a basic guide the installer should
a. Allow a 7-day drying time if the house has other forms of heating.
b. Allowatleast14daysiftheinstallationisinaneworunoccupiedproperty,oristtedintoacompletelynew
chimney breast.
Operating Tool
The operating tool serves two functions.
It is used to open the door and to operate the air control lever.
Combustible Wall
Heat Shield
Stove
Rear Rear Heat
Model No Heat Shield Shield Fitted
Sides Back Sides Back
18f 600mm 800mm 600mm 250mm
60f - - - -
250mmwithHeatShieldtted