EasyManua.ls Logo

JLL CT200 - Assembly; Preparing the Site; Diagram

JLL CT200
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
ASSEMBLY
2
Tondtheideallocationtosetupthiscrosstrainer,ensurethat:
• Area is well illuminated and well ventilated.
• Surface is level.
• There is enough space to access the unit and emergency dismount. If it is possible,
keep the following clearances: 0.5 m at each side and 2 m at the back.
• The cross trainer is placed in an environment with a relative humidity range of 30-
50%. Please ensure the temperature is kept constant. Do not use in a moist or damp
environment as this may impact on the integrity and performance of the machine.
PREPARING SITE
DIAGRAM
Handrail
Pulse Plates
Handlebar Post
Main Base
Front Stabiliser
Monitor
Resistance Dial
Foot Plate
Swing Arm
Rear Stabiliser

Table of Contents

Related product manuals