EasyManua.ls Logo

Johnson Controls YORK YLUA0078Z Series - Page 4

Johnson Controls YORK YLUA0078Z Series
178 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JOHNSON CONTROLS
4
FORM 150.73-NM1
ISSUE DATE: 07/03/2024



 

 





 

 


E = R-410A
J = R-454B
Z = Standard Efficency Unit
Y = High Efficency Unit
L = York Scroll
Nomenclature
See Nomenclature (Pin) on page 23 for
additional information on PIN.
Conditioned-based maintenance
Traditional chiller maintenance is based upon assumed
and generalized conditions. In lieu of the traditional
maintenance program, a Johnson Controls YORK
Conditioned Based Maintenance (CBM) program can
be substituted. This CBM service plan is built around
the specific needs for the chiller, operating conditions,
and annualized impact realized by the chiller. Your lo-
cal Johnson Controls Branch can propose a customized
Planned Service Agreement that leverages real time
and historical data, delivering performance reporting,
corrective actions required and data enabled guidance
for optimal operation and lifecycle assurance. The pro-
gram will include fault detection diagnostics, operation
code statistics, performance based algorithms and ad-
vance rules based rationale delivered by the Johnson
Controls Connected Equipment Portal.

Table of Contents

Related product manuals