EasyManuals Logo

KAESER ASD 25 User Manual

KAESER ASD 25
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #91 background imageLoading...
Page #91 background image
8. Attach the air pipe to the cover 14 with a new, self-locking nut.
9. Replace and tighten all fittings.
Dispose of parts and materials contaminated with oil in accordance with environmental
protection regulations.
Start the machine and carry out a test run
1. Close all access doors; replace and secure all removable panels.
2. Open the user's shut-off valve between the machine and the compressed air system.
3. Switch on the power supply and reset the maintenance interval counter.
4. Stop the machine after 10 minutes and visually check for leaks.
10.18 Refrigeration Dryer Maintenance
The refrigeration circuit is permanently sealed and needs no maintenance. Repairs may only be
carried out by certified personnel.
Material Compressed air for blowing out
Cleaning rags
Vacuum cleaner
Spare parts (as required)
Fig. 38 Refrigeration dryer
1 Access panel
4 Refrigerant condenser
5 Screws
Check and clean the refrigerant condenser and condensate drain regularly as described below.
10.18.1 Cleaning the refrigerant condenser
Precondition The power supply disconnecting device is switched off.
The disconnecting device is locked in the off position.
A check has been made that no voltage is present.
1. Undo the securing screws 5 and remove the panel 1 .
10 Maintenance
10.18 Refrigeration Dryer Maintenance
9_5721 06 USE
Service Manual Screw Compressor
ASD T Tri-Voltage
81

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KAESER ASD 25 and is the answer not in the manual?

KAESER ASD 25 Specifications

General IconGeneral
BrandKAESER
ModelASD 25
CategoryCompressor
LanguageEnglish

Related product manuals