EasyManua.ls Logo

Kampmann Venkon - Electromechanical Control Connection

Kampmann Venkon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Venkon
Assembly, installation and operating instructions
41
7.2 Electromechanical control, Venkon EC
7.2.1 Connection (U02M), Venkon EC
Fig.29: junction box
The junction box for electromechanical control (EC) as well as
the junction box for the condensation monitor can be electric-
ally installed separately from the side panel of the basic unit.
Simply remove the covering with screws to open the junction
box.

Related product manuals