EasyManua.ls Logo

Kampmann Venkon - Page 43

Kampmann Venkon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Venkon
Assembly, installation and operating instructions
43
Condensation water connection
Check whether the unit is connected leak-free to the on-site condensation connection.
Check whether the waste water lines are clean and have a sufficient gradient.
Check whether the condensation pump has a working power supply.
Once all checks have been completed, initial commissioning can be carried out in line with Kapitel 9 ā€žMaintenanceā€œ.

Related product manuals