GB - 10
Installation
3.2 Connection of the Power Unit
3.2.1 Mains Connection of the Supply Unit
• absolutely use a line reactor
• in case of interconnected operation with several supply units consider
information sheet 00.R5.0DM-I000 !
Switching at the input without waiting of an under-potential error (E.UP) causes
high wear of the switching contacts. Fuses and overcurrent protection units can
release furthermore. See publication ENG 000 0001.
Connection of the supply unit