56
CONNECTION OF THE POWER UNIT
4.2.3.2 Functional earthing
A functional earthing may also be necessary, if for EMC requirements additional poten-
tial equalization between devices or parts of the system must be available.
The use of the functional earth (FE) is not required if the frequency inverter is
EMC-technically wired.
The functional earth may not be wired green / yellow!
Notes on EMC-compatible installation can be found here.