Getting Started Welcome
10 EPM-P Installation Guide
Welcome
Welcome to the Keysight Technologies E4416A and E4417A EPM-P Series
Peak and Average Power Meters Installation Guide. This guide shows you how
to:
physically check the power meter
adjust the carrying handle
switch it on
confirm the meter passes the power on self test
connect it to a power sensor
carry out a zero and calibration routine
make connections to the rear panel
configure the remote programming interfaces
attach the rack mounting kits (supplied with Option 908 or Option 909)
NOTE Both single and dual channel power meters with variety of rear panel
configurations have been used for the illustrations in this guide. Your power
meter may differ in detail to those shown.
Initial Inspection
Please inspect the shipping container for damage. If the shipping container or
packaging material is damaged, it should be kept until the contents have been
checked mechanically and electrically. If there is mechanical damage, notify the
nearest Keysight Technologies office. Keep the damaged shipping materials (if
any) for inspection by the carrier and a Keysight representative. If required, you
can find a list of Keysight Sales and Service Offices on page 44.
Before continuing, please ensure you have read and understood the preceding