5 Set-up, installation and connection
5.1 Setting up the unit
When setting up the unit, observe the following set-up conditions:
n Select a dry and well ventilated set-up location.
n Do not set up the unit next to heat sources.
n Avoid direct sunlight.
n Set up the unit on a firm, level surface.
n Compensate for uneven ground with adjustable feet.
n Do not cover, block or line the ventilation grille.
n Do not cover, block or line the cooling machine.
n Maintain a minimum distance of 2 cm between wall and unit
(for example by means of a spacer).
n Maintain a minimum distance of 2 cm between units.
n Comply with the minimum available space at the set-up loca-
tion in order to avoid a potentially explosive as defined in DIN
EN378-1 for the use of refrigerators and freezers with combus-
tible refrigerants (R600a, R290a).
The basis for calculating the minimum available space
at the set-up location is the largest fill quantity of refrig-
erant in the existing or planned refrigerators. For the
respective fill quantity of refrigerant, see table
Ä
Chapter 13.2 ‘Technical data’ on page 73.
R600a: volume = refrigerant fill quantity / 8.6 g/m³
R290a: volume = refrigerant fill quantity / 7.6 g/m³
5.2 Installing the unit
MED 100 PRO-ACTIVE MED 200 PRO-ACTIVE
MED 126 PRO-ACTIVE MED 600 PRO-ACTIVE
FROSTER MED 95 PRO-
ACTIVE
Have the unit installed only by staff qualified for the task. If in
doubt, contact KIRSCH
Ä
‘Manufacturer’s address’ on page 4.
Install the unit as shown in the installation drawing provided.
Set-up
Overview of units suitable for
installation
Installing
Set-up, installation and connection
Installing the unit
23.05.2023 Refrigerator/freezer MED series 35

Table of Contents

Related product manuals