EasyManua.ls Logo

klover SOFT 80 - Technical Details and Warranty; PCB Parameters and Wiring Diagram

klover SOFT 80
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
SOFT 80, SOFT 100 PELLET-BURNING STOVE
EN - Rev. 1.0
Loosen the two screws shown in the picture (Figure 14) and dismantle the two RH and LH side panels (Figure 15).
Remove the cover of the cast iron top (Figure 17), by loosening the five screws shown in the picture (Figure 16).
14
15
16
17
1
2

Other manuals for klover SOFT 80

Related product manuals