71
MAINTENANCE
SERVICE SCHEDULE
The 6800 KMC Ripper Bedder has been carefully designed and manufactured to provide years
of dependable service. To maximize use and reduce downtime and repair costs, regular maintenance
should be performed on the Ripper Bedder. Below is a guide for minimum recommended services and
the time intervals for their completion. However, since these machines are used in many different con-
ditions and applications, the operator should customize the maintenance schedule to best fit their indi-
vidual needs.
SERVICE
EVERY
10 HOURS
EVERY
50 HOURS
EVERY
250 HOURS
1
INSPECT RIPPER POINTS
(REPLACE AS NEEDED)
X
2
INSPECT WEAR SHINS
(REPLACE AS NEEDED)
X
3
LUBRICATE ALL GREASE POINTS
* EXCEPT RESET-ON-THE-GO
(See Page 72 For Grease Schedule)
X
4
CHECK TORQUE ON ALL BOLTS
(See Bolt Torque Chart in Section
on General Assembly Set-up)
X
(INITIAL)
X
5 INSPECT HITCH PINS FOR WEAR X
6
INSPECT BEDDER DISC
(REPLACE AS NEEDED)
X
7
INSPECT BEARINGS
ON DISC GANGS
X
8
OPTIONAL SCRAPER-ADJUST POSITION
AGAINST DISC GANGS
(REPLACE AS NEEDED)
X
9
INSPECT RIPPER SHANKS AND TRIP
MECHANISMS FOR ANY DAMAGE
X
10 INSPECT TOOLBAR FOR ANY DAMAGE X
11
INSPECT TIRE PRESSURE IN ALL
GAUGE WHEELS.
X