EasyManua.ls Logo

Kohler 6VSG

Kohler 6VSG
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
52 Section 4 Scheduled Maintenance TP-6843 7/15
4.8.5 Battery
Perform battery storage last.
1. Press the OFF button on the generator set
controller.
2. Disconnect the battery, negative (–) lead first.
3. Clean the battery.
4. Place the battery in a warm, dry location.
5. Connect the battery to a float/equalize battery
charger, or charge the battery monthly using a
trickle charger. Follow the battery charger
manufacturer’s recommendations.

Table of Contents

Other manuals for Kohler 6VSG

Related product manuals