EasyManua.ls Logo

Krober O2 - Page 36

Krober O2
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Kröber O2
Service work
36
Reattach the mains cable to the holding
dome (see figure above right) using
cable ties.
10. connect all wires to the terminal strip
of the control board.
The strands are numbered in ascending
order to avoid confusion. Thereby
mean:
- No. 1 and 2: Mains cable
- No. 3 and 4: Temperature fuse
- No. 5 and 6: Compressor
- No. 7 and 8: Fan

Table of Contents

Other manuals for Krober O2

Related product manuals