3. Completely unthread the power
cord from the housing.
3.7.2 Installation of the mains power cable
1. Thread the bend protection of
the mains cable into the
corresponding recess on the
underside of the housing.
2. Feed the power cable through
the vertical air duct and then
above the left housing dome and
the printed circuit board to the
terminal strip.
3. Strand 1 to terminal 1
Strand 2 to terminal 2
connect and screw tight.