EasyManua.ls Logo

Kyocera TASKalfa 266ci - Page 267

Kyocera TASKalfa 266ci
382 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2PZ-1
1-5-78
(Attaching the new ISU)
57. Fold the FFC wire of the new ISU with
the alignment to the right.
(1)Fold the FFC wire in 90 degrees at
300mm from Alignment G at the edge of
the holder passing the FFC wire to make
Alignment H.
(Or, fold it in 90 degrees on the line con-
necting the Alignment H and Alignment H'
at 33mm from H.)
(2)Fold it in 90 degrees at Alignment I at
135mm from the Alignment H' to make
Alignment J.
(3)Fold the FFC wire in 180 degrees at the
Alignment J.
(The reference length from the
Alignment J to the wire's edge is about
195mm.)
(4)Unfold the FFC wire to easily pass the
FFC wire through the ferrite core at the
next step.
Figure 1-5-127
58. Pass the ISU's FFC wire through the
ferrite core affixed on the scanner frame
and then pass its edge through the
aperture in the center of the scanner
frame.
Figure 1-5-128
G
G
G
300mm (+/-1mm)
H
33mm (+/-1mm)
135mm
(+/-1mm)
I
J
H'
J
180 degrees
About 195mm
Ferrite core
FFC wire
Aperture

Table of Contents

Other manuals for Kyocera TASKalfa 266ci

Related product manuals