Rigging procedures
Rigging procedures
Flying 5XT
wall-mountingtype of deployment
ceiling-mounting
rigging accessories ETR5
additional material 2 x
∅
10 mm / M10 screws and anchors (depending on the support material)
torque screwdrivertools
T30 Torx bit
Fasteners for ceiling-mounting.
Select screw length and anchors applicable to the ceiling properties.
Assembly
Procedure
1. On both sides of the enclosure, remove the screws.
T30
2. Secure the ETR5 to the wall or the ceiling using two
∅
10mm/M10 screws.
3. Position the enclosure inside the ETR5 bracket.
5XT owner's manual (EN) version 4.0 25