Corrective maintenance
Corrective maintenance
Introduction
This section contains the following maintenance procedures:
5XT
• D/R - Grill (p.34)
• D/R - Coaxial loudspeaker (p.35)
• D/R - HF diaphragm (p.36)
For advanced maintenance, contact your L-Acoustics representative.
Tools and consumables
Before performing maintenance on this product, make sure all the tools listed are available. References are given for
FACOM
®
products in this table. Other manufacturers can be used.
name reference distributor
set of 6-point 1/4" sockets * RL.NANO1 / R.360NANO FACOM
torque screwdriver (2 - 10 N.m) * A.404 FACOM
3 mm hex wrench - -
compressed air blower - -
double face adhesive tape - -
* included in the L-Acoustics Maintenance Toolcase.
Maintenance Toolcase
The Maintenance Toolcase is a carry-on suitcase that includes all the tools required to perform maintenance on L-
Acoustics products. This toolcase is aimed at Certied Providers.
The Maintenance Toolcase uses a Peli
™
1510 Protector case that features three pre-cut layers of foam to safely t the
tools. The Maintenance Toolcase includes tools manufactured by FACOM
®
, Fluke
®
, Tohnichi, ABUS, and Würth.
All third-party trademarks, registered trademarks, or product names are the property of their respective owners.
32 5XT owner's manual (EN) version 4.0