EasyManua.ls Logo

Lauda Ecoline E 215 T - Page 21

Default Icon
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparations
15.05.01
YAEE0013
15
Operation with cooling coil
( Section 10.
Accessories)
Pull the clamping bracket to the back for fixing the
cooling coil while releasing it with a screwdriver.
Push the cooling coil on the clamping bracket.
Install the clamping bracket again.
Operation with fixing rod
( Section 10. Accessories)
Pull the clamping bracket to the back while releasing it
with a screwdriver.
Install the fixing rod together with the clamping bracket.
Operation with external circuit
( Section 5.4.)
The immersion thermostats have to be fixed carefully at the bath, for they must
not fall into the bath.
In that case don’t touch the bath liquid! Pull out mains plug immediately!
a) Bath/Circulation thermostats
Place the unit on a flat surface.
Do not cover the ventilation openings at the
back.
Keep a clear distance of at least 20 cm.
Put the control unit with the bath bridge on
the bath
When operating without an external
consumer (bath thermostat) the setting
knob has to be turned so that the flow
comes out of the outlet for bath circulation
( ill. 3, Section 5.1.).

Related product manuals