Preparations
20
5.4 Connection of external circuits
a) Immersion thermostats
− Push 11-12 mm int. dia. tubing (➾ Section 5.3.) directly
onto the jet nozzle and connect it to the external circuit.
− Hang the return tubing into the bath and fix it!
− We recommend to use the pump set (➾ Section 10.
Accessories). In this case
− screw on the pump connectors.
− install the connecting tube.
− Using the setting knob at the pump outflows, divide up
the pump flow in accordance to the thermostating
task.(➾ Section 5.1)
− Position
➀
➀➀
➀
!
maximum flow in the external circuit, the
setting knob is turned anticlockwise.
− Position
➁
➁➁
➁
! flow passes through pump outflow and
outlet for bath circulation, the setting knob is in medium
position.
− Position
➂
➂➂
➂
! external circuit is closed and the outlet for
bath circulation fully open, the setting knob is turned
clockwise.
− Operate the setting knob only when the bath contents are near ambient
temperature.
− When no tubing is connected, close the pump outflow with closing plugs even in
position ➂
➂➂
➂.