EasyManua.ls Logo

Lauda Ecoline E 215 T - Page 27

Default Icon
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparations
15.05.01
YAEE0013
21
b) Bath/Circulation thermostat
Connect 11-12 mm int. dia. tubing ( Section 5.3.) to
the pump connector.
Pump outflow connection always in front, return
connection always at the back.
If the cross-section of the tubing is too small ! temperature drop between bath
and external system due to low flow rate. Increase the bath temperature
appropriately.
Always ensure the maximum possible flow cross-section in the external circuit!
When the external consumer is placed at a higher level than the thermostat, the
pump is stopped and air penetrates into the thermostating circuit the external
liquid may drain down into the bath even with a closed system
!
danger of
flooding the thermostat!
Protect tubing with hose clips against slipping off!
When no external circuit is connected to the thermostat, the outflow connection
must be closed (use closing plugs) or linked to the return!

Related product manuals