TLT235TLT240 Economical Two-post User’s Manual
22
10.2.5 Install the offside column
Install the offside column as the procedures in10.2.3.
10.2.6 Install and adjust the balancing steel cables
z Raise the two carriages to the safety locking position;
make sure the two carriages are of the same height
from ground. for TLT235SCTLT240SCTLT235SC
U models, route the steel cables as Fig. 13a
shows ,for TLT235SBTLT240SB models, route the
steel cables as 13b shows..
z Adjust the tension of cables through the adjustment
nuts on each end of steel cable. The steel cables
should be tight in equal tension. Each steel cable
should be ensured in the pulley when adjusting tightly,
otherwise the steel cable will be damaged.
Note
Before operating the lift, re-check the
balancing steel cables and ensure they are not
crossing or wrongly installed. Ensure the steel cables
still in the pulley.
Fig.13a