Page 12PROTECTOR® IV Top of Rail Installation, Operation & Maintenance Manual
13. '*%23*&)4*&+.2/)$/1&>.6)#&).&)4*&%6"+<&>6.%T#&)$14)*/$/1&)4*&3$14)&>.6)&03#)&).&*/#23*&)4*&).<&.8&3"$6&5$<$/1&
bars is pushed securely against the rail.
14. Occasionally tap the outside edge of the mounting foot with a hammer during tightening to insure TOR
wiping bars remain tight to the rail.
15. Torque mounting bolts to approximately 200-250 ft-lbs (340 N-m).
ML Top of Rail Wiping Bars
The installation of ML TOR distribution bars should be carried out using the same instructions as the MC-4TR
TOR distribution bars. Figure 4 illustrates how the installed bar should be assembled.
Distribution Hose Installation
Install one main supply hose and four grease distribution unit hoses as follows:
1. Run main supply hose from tank, underneath the rail, to a position central to wiping bar assemblies.
2. C"(.2)&)4*&ij]&%./0123")$./&.8&?"6?*#&5$)4&+"$/&4.#*&"/;&;$#)3$>2)$./&4.#*#9&
3. D43*";&)4*&+"$/&#2<<6(&4.#*&).&)4*&ij]&%./0123")$./&.8&?"6?*#&")&%*/)*3&)3"%T9&
4. D43*";&*"%4&4.#*&>*)5**/&ij]&%./0123")$./#&.8&?"6?*#&).&"/&$/;$?$;2"6&5$<$/1&>"39&
Note: Hoses supplied by the customer must be non-conducting, this ensures the hose system will not shunt signals.
All customer supplied hoses must be the same length as those supplied by L.B. Foster. If longer or shorter,
!"#$"%&#&$'(&!)(*+!(%,$#-.(#,.(#&$/(00$*#$."1,2#'3$1,'$!"(&$.%+0'$0#1'$!%$!%%$4+."$%)$!%%$0(!!0#$0+*)(.1,!$
*#(,2$1550(#'$!%$!"#$)1(06
Figure 4: TOR -ML Wiping Bar Installation