EasyManua.ls Logo

Leach 2R-III - Preventive Maintenance

Leach 2R-III
168 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Preventive
Maintenance
The 2R-III has been designed for long periods of
efficient uninterrupted operation. Careful attention to
proper preventive maintenance, as described in this
chapter, will ensure and extend trouble-free operation
of the unit. Particular attention to correct lubrication
of the unit and maintenance of the return filter, are
probably the two most vital areas of preventive
maintenance required. The objective of preventive
maintenance is to anticipate and prevent operational
difficulties before they require extended shut down for
costly repairs.
Operating and Maintenance
Records
Prepare and adhere to a maintenance schedule. Keep
detailed records of all maintenance performed.
Regularly inspect operating and maintenance records
for deviations from normal operating conditions.
Analyze the records for indications of potential
trouble.
NOTE: Occasionally distributors will receive Service Bulletins
from Labrie Enviroquip Group concerning updated
maintenance information. Keep those bulletins with
this manual and make notes at the appropriate places
in the manual referencing the updated information.

Table of Contents