EasyManua.ls Logo

LEGRAND celiane - Page 54

LEGRAND celiane
105 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SCS BUS SYSTEM
GENERAL RULES FOR INSTALLATION
III-96
This operation for the arrangement of the electric system
consists in marking the paths of the connection ducts on the
walls. These paths may be vertical or horizontal.
Diagonal paths must be avoided unless, they must follow an
inclination of the wall or ceiling. Inside the ceiling and under the
floor, ducts may be installed as desired.
The distribution of wall boxes and loads/users, depends on the
type of room and the type of load to be connected.
Layout
of the ducts
NO
NO
OK
OK
OK
OK

Related product manuals