Lennox CHA16 - A7 diagram with B2 diagram ECH16-185;255;275;300 45 kW 460 V & 575 V Sequence; Operation Sequence: A7 Section and B2 Sections (45 kW 460 V or 575 V electric heat wired to CHA16-1853); 1- 1 st stage heating demand closes W1...; 2- When K15-1 closes, heating elements HE1 and HE2 are both energized...

Lennox CHA16
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 75
A7diagram
with B2 diagram
ECH16-82/95/135/160 40kW 460V & 575V Operating Sequence
Operation Sequence: A7 Section and B2 Sections
(40kW 460V or 575V electric heat wired to CHA16-1603)
1- 1st stage heating demand closes W1. W1 passes through primary limits S15 to energize contac
tor K15 and relay K9. K151 contacts close and K91 and K92 both switch.
2- When K151 closes, heating elements HE1 are energized. The elements are arranged in a
Wye" configuration for 460V or 575V operation.
3- When K91 switches, indoor blower contactor K3 is energized. When K92 switches, time delay
DL2 is enabled (circuit is closed to W2).
4- When K3 is energized, the indoor blower is powered (and optional economizer opens to mini
mum position when K32 contatcs close).
5- Additional heating demand W2 passes through K92 to energize time delay DL2.
6- DL2 closes after 30 seconds. Contactor K16 is energized.
7- When K161 closes, heating elements HE2 and HE3 are energized.