▪ Execution environment requires setting JAVA_HOME environment variable, and JRE8 or
later.
▪ See
Command Line Interface (CLI) Reference and follow the complete command syntax
for this operation.
3.
When the controller is back online, confirm that its status is Optimal, and check the controller
shelf’s Attention LEDs.
If the status is not Optimal or if any of the Attention LEDs are on, confirm that all cables are
correctly seated, and check that the battery and the controller canister are installed correctly. If
necessary, remove and reinstall the controller canister and the battery.
If you cannot resolve the problem, contact technical support.
4.
If needed, collect support data for your storage array using ThinkSystem System Manager.
a.
Select Support › Support Center › Diagnostics.
b.
Select Collect Support Data.
c.
Click Collect.
The file is saved in the Downloads folder for your browser with the name, support-data.7z.
After you finish
Your battery replacement is complete. You can resume normal operations.
15