EasyManua.ls Logo

Lenze i700 Series

Lenze i700 Series
162 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical installation
Preparations
Integrated PE conductor connection
6
l
103
EDS700ACBA EN 5.1
6.5 Preparations
When the mechanical installation has been completed, the electrical wiring starts with
the creation of the integrated electrical connections:
6.5.1 Integrated PE conductor connection
How to proceed:
ƒ Use the swivel hook to establish the PE conductor connection of the devices.
Loosen the screws
Turn the swivel hook into the right position
Fasten the screws
ƒ At the left and right device of an installation row, attach the PE connection twice
conforming to standards.
ƒ Then attach the shield connection sheet.
i700A00x
Terminal data
Conductor cross−section Tightening torque
!
[mm
2
] [AWG] [Nm] [lb−in]
Swivel hook + 2.5 22.1 PH 2
i700M00x

Table of Contents

Other manuals for Lenze i700 Series

Related product manuals