LG Multi V Water IV - Pre-Commissioning Checklist: Package Documents and Commissioning Request; Pre-Commissioning Package Documents Checklist; Initiate System Commissioning Request

LG Multi V Water IV
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
127
*This form must be completed and submitted to LG a minimum of three (3) weeks prior to nal scheduling of any startup.
Note: If any of the above items are not complete at time of start-up, back charges will be assessed for additional costs.
Contractor Name: ______________________________________ ____________________________________________________
(Authorized Signature)
Address: ____________________________________________
____________________________________________
Phone: _____________________________________________ Date: _______________________________________________
PRE-COMMISSIONING CHECKLIST
Page 2
Prepare Pre-commissioning Package Documents
Include Check
1. A copy of the refrigerant piping system(s) shop drawing(s) generated by LATS Multi V pipe design software.
2. A copy of the pipe fitter’s pipe changes and field notes.
3. A verified copy of the “As-Built” LATS Multi V Project file (*.mtv) that includes all changes noted by the pipe fitter(s) in
Number 2. The tree diagram notes should include changes to the line lengths used for each liquid line segment
4. A copy of a completed and verified Installation Checklist for the water source unit, indoor units, ERVs, Air Cleaners, and Con-
trol Devices. Correct any items needing attention before requesting commissioning..
5. A copy of the air balance report showing proper airflow at all indoor units.
6. A copy of the water circuit’s control sequence of operation.
7. A water circuit flow balancing report.
8. A completed Pre-commissioning Device Configuration Worksheet.
9. A completed copy of the Pre-commissioning Checklist (this checklist).
10. If available, a list of IP addresses obtained from the building owner’s IT department for each ACP, BacNet, LonWorks, AC
Smart II, or AC Smart Premium devices.
Initiate a Commissioning Request
Description Check
Verify this checklist and requirements herein have been met. Complete this checklist in its entirety BEFORE requesting
Commissioning.
Send all Pre-commissioning Package Documents to your LG Applied Representative.