Installation
Due to our policy of continuous product innovation, some specications may change without notication.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
EEV KIT INSTALLATION
PRLK396A0 Wiring
Figure 25: PRLK396A0 EEV Kit Wiring.
Wiring Installation
1. Open the terminal box cover.
2. For PRLK396A0, run the field-supplied wiring (six [6] wired, 18AWG, stranded, shielded copper) to / from the AHU Communications Kit
through the cable connector on the EEV Kit.
3. Connect wiring to the terminal connections following the label and color codes pasted onto the bottom of the terminal box and shown
below. Securely tighten all connections.
4. Route the wiring through and out the EEV Kit as shown, and secure with the support tie (D).
5. Re-install the terminal box cover and secure the cover with the four (4) screws.
6. Taking care not to damage the field-supplied wiring or insulation, reattach the EEV Kit Top Panel by securing it with the screws at the four
(4) corners.
BR : Brown
RD : Red
BL : Blue
OR : Orange
YL : Yellow
WH : White
Field Wiring
A
B
PRLK396A0 EEV Kit
(cover removed)
10-3/4
7-1/2
Mounting
Hole 1/4
Pipe Outlet 5/8
to AHU coil liquid
pipe connection
Pipe Inlet 5/8
from ODU
D
D
AHU controller
Detail
A. Terminal Box Cover
B. Cable Strain Relief Connector
C. Terminal Connector
D. Electrical Wiring (field supplied,
6 wires, 18 AWG, stranded,
shielded