EasyManua.ls Logo

LifeSafety Power FlexPower Netlink NL2

LifeSafety Power FlexPower Netlink NL2
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Netlink Installation and Operation Manual
iv 1
Installation and Operation
The following pages cover the installation of the Netlink Network Communication Module.
1.1 Mounting the Netlink Communication Module
U
se the following procedure when mounting the Netlink module to a LifeSafety Power enclosure.
1. Locate the appropriate mounting holes in the enclosure and snap the four standoffs provided into the holes.
2. Align the board mounting holes (mounting hole locations are indicated in the drawing below) with the standoffs and snap
the board onto the standoffs. Be sure the board is properly oriented before snapping the board onto the standoffs.
NL2/4
NLX
Figure 1.1
Section 1 – Installation

Related product manuals