Page 7 of 23 FA69350–2 English
Jun 2013
23
How To Create a Production Schedule
Linx 7900
9 Repeat steps 4 to 8 to add the second message, then the third message. The
completed production schedule is shown below.
Figure 7. Production Schedule Editor page: complete schedule
10 Press the Exit key to display the Save As page.
Figure 8. Save As page
Use this page to save or discard the production schedule, or change the default
name before you save the schedule.
69417
69418