Chapter 4 Operation Procedures and Monitoring
4-6
4.3 Monitoring and Test
This description is based on XG5000 Project of XGK series, because it is the same to parameter setting method of XGK and XGK
series.
4.3.1 Monitoring and Test
1) After connected to PLC CPU through XG5000, click [Online]-[Special Module
Monitoring] or on the icon menu to display the screen as shown below.