CONTENTS
5. Lubrication and Maintenance
5-1. General information ·····································5-1
(1)TighteningTorquefornormalassembly···················· 5-2
(2)Standardtorquedataforhydraulics···························5-4
(3) General specification - Diesel fuel ····························5-7
(4)Biodieselfuel···········································5-8
(5)Refuelingthetractor·····································5-10
(6) Change engine coolant to Organic Acid Technology (OAT) coolant · · · · 5-11
(7) Access for maintenance ··································5-12
5-2. Maintenance chart ····································5-13
5-3. Lubricants and Capacity ································5-15
5-4. First 50 hour check ····································5-16
5-5. When the warning indicator lights
(1)DrainwaterfromFuelfilter································5-17
(2)Engineoilpressureindicator······························ 5-18
(3)Batterychargingindicator································5-18
5-6. Check before starting (Daily check)
(1)Engineoil············································5-19
(2)Fueltank·············································5-20
(3) Instrument panel & Indicators · · · ···························5-20
(4)Turnsignallights,LightsandHorn···························5-21
(5)Enginecoolant········································5-21
(6) Air cleaner (Dry type) ····································5-22
(7)CleaningofRadiatorandRadiatorscreen·····················5-23
(8)Tireairpressuredamage·································5-23
4-5. Field Operations
(1)Rear3-pointlinkage·····································4-17
(2)Powertake-off(PTO)operation····························4-21
(3)HitchandDrawbar(optional)·······························4-25
(4)Technicallymaximumpermissiblemass······················4-26
(5)TiresandLoadcapacity··································4-27
(6)AdjustingWheeltracksandtirereplacement···················4-28
(7) Using Front-end loader (if fitted) · · ·························4-33
(8)AdjustingSteeringangle·································4-36
(9) Recommended Maximum Specification of Implements · · · · · ······4-37
(10)BallastingWeights(optional)······························4-38
(11)Workinginhazardousarea·····························4-41
4-6. Driving Speed ········································4-42