EasyManua.ls Logo

MacDon 973 - Page 43

MacDon 973
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Form # 147083 Issue 01/07
41
MAINTENANCE/SERVICE
GREASING THE HEADER – 100 Hours (cont’d.)
9 Upper Cross Auger Support Bearing
(if equipped) (H) - one fitting at right end
11. Gauge Wheel Pivot Bushings (if equipped) (D)
– two fittings
10. Upper Cross Auger Center Connection
(if equipped) (J) – two fittings on 30’, 36’, & 39’
500 Hours or Annually
1. Gauge Wheel Hub Bearings (if equipped) (A) –
two fittings
UPPER CROSS AUGER SUPPORT BEARING
(IF EQUIPPED)
H
GAUGE WHEEL PIVOT BUSHINGS
(IF EQUIPPED)
GAUGE WHEEL HUB BEARINGS
A
UPPER CROSS AUGER CENTER CONNECTION –
30’, 36’, 39’ (IF EQUIPPED)
J
J

Table of Contents

Related product manuals