EasyManuals Logo

Manitowoc MLC100-1 User Manual

Manitowoc MLC100-1
218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #160 background imageLoading...
Page #160 background image
SETUP AND INSTALLATION MLC90A-1/MLC100-1 OPERATOR MANUAL
4-50
Published 12-10-19, Control # 258-05
Install Boom Pendants
See Figure 4-32.
1. Carefully uncoil the pendants alongside the boom. Use
care not to kink them.
2. Thoroughly clean and lubricate the pendants.
3. Starting at the boom top:
a. If not already done, pin the links (2, View A) to the
boom top pendants (1) with the pins (3).
b. Lift the boom top pendant (1 View A) into position on
the boom top.
c. Pin the links (2, View A) to the boom top with pins
(3).
NOTE: The pendants must be installed in the same
sequence as the inserts.
The pendants are furnished in matched sets of two
and must be installed in matched sets — pendant
on one side of insert must match pendant on other
side of insert.
4. Lift the adjacent insert pendants (4) into position on the
insert.
5. Pin the pendants together with the pins (5, View B) —
pin heads toward inboard side of pendants.
6. Repeat the steps until all of the pendants are installed
and pinned.
Figure 4-32
Item Description
1 Boom Top Pendant: 6,9 m
2 Links (stored in parts box)
3 Pin with Cotter Pins
4 Insert Pendant: 3m, 6 m, 12 m
5 Pendant Pin with Cotter Pin
View A
View B
WARNING
Flying Object Hazard!
Use extreme care when handling coiled pendants. Stored
energy can cause the coiled pendants to uncoil quickly
with considerable force.

Table of Contents

Other manuals for Manitowoc MLC100-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC100-1 and is the answer not in the manual?

Manitowoc MLC100-1 Specifications

General IconGeneral
BrandManitowoc
ModelMLC100-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals