3
Service manual April 2017 Uber boiler
3 - SERVICE (cont’d)
3.6 Uber Boiler Load Cell Replacement
3.6.1 Attaching Loadcell to Tile
3.6.2 Fixing Support Platform to Loadcell
3.6.3 Platform Adjustment Screws
3.6.4 Font Dial Replacement
3.7 Font to Tile Installation Instructions
3.7.1 Aligning the Font on the Tile
3.7.2 Connecting the Font Tubing
3.8 Water Level Probes Installation
4 - TECHNICAL
4.1 Uber Boiler Functional Diagram
4.2 Spare Parts Diagrams
4.3 Electrical Schematic