Chapter 3 Installation
- 21 -
Step
Item Task
3 Moving the
equipment
When lifting and moving dehumidifying dryer main body as shown in
Figure, be sure that eyebolts (4 pieces) fixed on the top are securely
screwed and then hook load lifting rope (with hooks) on them and lift
and move dehumidifying dryer with using hoist at your company.
<Only for DMS2-80,120/DMZ2-40type>
Picture 20