The gate must be properly installed and work freely in both directions prior to the installation of the gate operator.
The chain is not visible when looking from outside of the property.
Outside Property
Inside Property
Input Power
Physical Stop
Conduit
Run
Operator MUST be level.
Concrete Pad
Check local building
codes in your area for
depth of concrete
before installation.
Install positive stops on BOTH ends of rail
to keep gate from traveling off of rail.
Guide rollers MUST be Installed to keep gate upright.
6” above ground to avoid any flooding of the operator.
See page 9 for chain information.
Illustrations not to scale
Gate in Closed Position
Secure gate operator to
concrete pad with four
(4) 1/2” x 3” (min)
sleeve anchors.
24”
4”
V-Rail
Physical Stop
2” Gate Frame
installation
operator in rear mounting position (alternate)
Operator in Rear Position
“Optional” Input Power Note:
24VDC low voltage power wires can be run
from a remote power supply (MAX Magic
Box) to power the gate operator if desired.
See page 11 for more information.
Concrete Depth Note: The heavier the gate, the deeper the concrete
pad should be. At least two feet recommended for heavier gate.
• REQUIRED - AC input power wire.
• Entrapment protection photocell. See page 14.
• Entrapment protection sensing edge. See page 15.
• In-ground loop wires. See page 16.
Conduit Guidelines and Suggestions
1/2
Operator Position on Concrete Pad
Concrete Pad
24”
10.5”
10.5”
6.2”
6.75”
7.5”7.5”
6.75”
Cover
1.5”
4”5”
6.5”
8.625”
12.75”
Conduit
Area
ONE Entrapment protection sensor MUST installed or
operator will NOT function. It MUST be MONITORED
and NORMALLY CLOSED (N.C.)