EasyManua.ls Logo

Maximum Controls MAX 2200 - Dual Gate Operators - Front Mounting Position

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Outside Property
Inside
Property
Gates Full Closed Position
RS-485
Input
Power
Input
Power
Conduit RunsConduit Runs
Illustrations not to scale
Primary OperatorSecondary Operator
Has NO Matrix 1 Control Board
Primary Operator
Matrix 1
Secondary Operator
NO Matrix 1
See page 7 for chain information.
installation
dual gate operators - front mounting position
The gates must be properly installed and work freely in both directions prior to the installation of the dual gate operators.
See “Operator in Front Mounting Position” on page 6 for operator positions.
REQUIRED - AC input power wire to EACH gate operator.
REQUIRED - RS-485 wires CONNECT operators together.
Entrapment protection photocell wired to EACH Corresponding OPERATOR. See below & page 14.
Entrapment protection sensing edge wired to EACH Corresponding OPERATOR. See below & page 15.
Normally open photocell safety protection wires to MATRIX 1 See below & page 14.
In-ground loop wires to MATRIX 1. See page 16.
Optional external OPEN/CLOSE key switch wires from EACH OPERATOR to key switch. See page 37.
Conduit Guidelines and Suggestions
To MC-200 Edge 2 or Photo Cell Input
To MC-200 Edge 2 or Photo Cell Input
To MC-200 Edge 2 or Photo Cell Input
To MC-200 Edge 2 or Photo Cell Input
To MC-200 Edge 2
or Photo Cell Inputs
To MC-200 Edge 2
or Photo Cell Inputs
To MC-200 EDGE 1 Input
OPENING direction
Sensing Edge
OPENING direction
Sensing Edge
OPENING/CLOSING
Sensing Edges
OPENING direction Sensing Edge OPENING direction Sensing Edge
Reflector
CLOSING direction Photocell
OPENING
direction
Photocell
OPENING
direction
Photocell
ONE REQUIRED
Each entrapment protection device MUST be connected to corresponding gate operator.
See pages 14-15 for installation instructions.
See pages 19-20 for wiring instructions.
Dual Gates CLOSING direction Thru-Beam Photocell ONLY:
See separate wiring instruction sheet.

Table of Contents

Other manuals for Maximum Controls MAX 2200

Related product manuals