EasyManua.ls Logo

Memmert HPP - Putting into Operation; Connecting and Switching On

Memmert HPP
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D24030 | Date 11/2018 23
Putting into operation
4. Putting into operation
Caution:
The first time the appliance is operated, it must not be left unattended until it has reached
the steady state.
4.1 Connecting the appliance
Caution:
Observe the country-specific regulations when mak-
ing connections (e.g. in Germany DIN VDE 0100 with
residual current circuit breaker). Observe the connec-
tion and power ratings (see nameplate and Technical
data on page 14).
Make sure to establish a safe PE
conductor connection.
Plug the provided power cable into the rear of the appli-
ance and connect it to the power supply ( Fig. 11 ).
Lay the power cable so that
it is always accessible and within reach so it can be disconnected quickly in the event of
failure or emergencies;
no one can trip over it
it does not come into contact with any hot parts.
4.2 Fill up and connect the water tank
(for constant climate chambers HPP only)
Water specifications
For steam creation, use only: demineralised/desalinated water (Aqua Dem) with a conduc-
tivity 10 μS/cm. Otherwise, possible calcification in the steam generators, steam piping
and steam generator pumps could affect the correct functioning of the appliance. Only use
chlorine-free water with a pH value of > 5 and < 7.
Fig. 11 Connect the power
cable to the rear of the appliance

Related product manuals