EasyManua.ls Logo

Mercury 200 - Outboard Installation; Trim In Pin

Mercury 200
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OUTBOARD INSTALLATION
105
2. Attach the throttle cable to the throttle lever. Secure with a
washer and locknut. Tighten the locknut to the specified value.
a
b
or107
a - Nylon washer
b - Locknut
Description Nm lb. in. lb. ft.
Throttle cable locknut "b" Tighten then loosen 1/4 turn.
3. Adjust the cable barrel so that the installed throttle cable will
hold the idle stop screw against the stop.
c
a
b
28751
a - Barrel sleeve
b - Cable barrel
c - Idle stop screw
4. Check the throttle cable adjustment as follows:
a. Shift the outboard into gear a few times to activate the
throttle linkage. Rotate the propeller shaft while shifting into
reverse.
b. Return the remote control to neutral.

Table of Contents

Other manuals for Mercury 200

Related product manuals