Chapter 7: Troubleshooting
Load Cell Replacement Procedure
(10/96)
Thread the load cell cable through the connector on the junction box.
When the cable length inside the box is sufficient, tighten the box
connector.
Wire the new load cell cable to the proper terminal on the PCB per the
wiring code shown.
Reinstall the deck into the frame. Ensure that the rocker pins are properly
seated and aligned with the receivers in the frame.
Reattach the instrument cable and power-up the indicator. Perform shift
adjust and recalibrate the scale .
Note: It may be necessary to apply a
small amount of lubricant to the
cable to allow it easily pass through
the double hole cord grip.