EasyManuals Logo

Miele PWM 508 Mop Star 80 User Manual

Miele PWM 508 Mop Star 80
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #87 background imageLoading...
Page #87 background image
Supervisor level
87
Network time
The date and time can be synchron-
ised over the network.
- Off
The date and time are not synchron-
ised over the network.
- As master
The machines are in a network but
are not connected to the Internet. A
machine is declared as the master
and sends data to the slave devices.
- As slave
The machines are in a network and
are connected to the Internet. All ma-
chines are configured as slaves. Data
is synchronised over the Internet.
External programme lock
The control unit has an option to block
programmes. Programmes are
blocked by an external system via the
COM interface.
Factory default: Off
Peak load signal
The peak-load negotiation function
enables the washing machine to be
connected to an energy management
system. When a signal is registered,
the washing machine's heater is
switched off for a short period. The
washing machine may only be oper-
ated with a peak-load system if this
system is connected to the washing
machine via the Miele XCI box.
- No function (factory default)
- Peak load with 230V
- Peak load with 0V
Peak load prevention
The peak-load negotiation function
can be deactivated with disinfection
programmes. When a signal is re-
gistered, the washing machine's
heater is not switched off.
Factory default: Off

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Miele PWM 508 Mop Star 80 and is the answer not in the manual?

Miele PWM 508 Mop Star 80 Specifications

General IconGeneral
BrandMiele
ModelPWM 508 Mop Star 80
CategoryWasher
LanguageEnglish

Related product manuals