Once the machine is in place and assembled this far, have the power and air supplies
connected by qualified personnel as described in chapter 1. See the safety checklist on
page 2 for qualifications.
Place the leveling block on the tailstock ways as
pictured, then rough level the machine.
Slide the flood coolant tank under from the front of the machine.
Connect the chuck and tailstock foot switches to the front of the machine
24