© 2014 MIMAKI ENGINEERING CO.,LTD. 5.1 P.4
5.1 Changing the Joints
R.1.0
1
2
3
4
5
6
7
Joint change procedure at the circulation path
Work procedures
1. Remove front cover.U
2. Remove the carriage cover and front cover.
3. Remove the banding bands that fix the circulation tubing.
Carriage cover
Front cover
Move the band's tab downward to release the
lock.
INSTALLATION GUIDE > Ink Set > Changing the Joints
Model
CJV300
Issue
2014.09.01
Revised F/W ver.
1.30
Remark
1.0