EasyManuals Logo

Mira Elite ST Installation Guide

Mira Elite ST
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
15
COMMISSIONING
Electrical supply is turned
off at the mains.
Turn BOTTOM control to
full cold.
Turn water supply fully
on.
Switch on electrical
supply.
Check for water leaks. Turn TOP control to
LOW.
1.
2.
3.
4. 5. 6.
7. 8. 9.
Push START button.
Water will be at full force and
at a cool temperature.
Turn BOTTOM control
slowly. Temperature
remains cool and ow is
reduced.
COLD
0-5 secs
Before carrying out the commissioning procedure install the Shower Fittings,
refer to the Shower Fittings Installation and User Guide.
If you are unsure how an electric shower works, please read through the User
Instructions section before continuing.

Other manuals for Mira Elite ST

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mira Elite ST and is the answer not in the manual?

Mira Elite ST Specifications

General IconGeneral
Flexible hoseYes
Product colorChrome, White
Number of shower heads1 head(s)

Related product manuals